¿Listo para implementarlo en tu Odoo?
Agenda una demo o habla con un consultor y resuelve tus dudas antes de comprar. Instalación, configuración y soporte incluidos.
MI ERP Gantt Open-Source Pro — Odoo 19
Modern Gantt engine with Critical Path, Baselines and Auto-scheduling — free & open-source (LGPL-3)
Description
MI ERP Gantt Open-Source Pro is a standalone, generic Gantt chart engine for Odoo 19, suitable for any module that needs to schedule activities — construction works, software projects, event planning, manufacturing campaigns. It ships a custom Critical Path Method (forward + backward pass) computed client-side, four dependency types (FS / SS / FF / SF) with lag and lead in working days, multi-baseline overlays, auto-scheduling of successors and a resource allocation histogram.
Round-trips schedules with Microsoft Project via the MSPDI XML format (2019+), captures PNG snapshots in one click and renders with rounded bars, amber project markers and red critical-path highlight in the MI ERP palette. Designed to be extended — sibling bridges connect it to BIM/IFC viewers, construction APUs and field-foreman PWAs.
Product screenshots
Real screenshots from the module running on Odoo 19 with seeded data, captured by the Playwright audit suite.
Gantt with Critical Path
Forward + backward pass computed client-side: every task on the critical path turns red. Rounded bars, DHTMLX-style header bands, amber project markers, FS/SS/FF/SF dependency arrows with lag/lead. Drag a bar — every successor reschedules respecting the working calendar.
WBS sidebar (Tabulator)
Hierarchical sidebar with WBS, name, start, duration and resources powered by Tabulator. In-cell editing, expand/collapse of summary tasks, multi-level indentation and a synchronized scroll with the chart.
Multi-project selector
List view of every Gantt project, with progress %, start/end and active calendar — switch contexts in one click.
Project form
Project header with calendar, baselines, currency and zoom level. Open the Gantt straight from the smart-button.
Settings dropdown
Ten Bryntum-style toggles: critical path, baselines, project lines, non-working highlight, cell editing, progress line, rollups, list-only mode…
Resource histogram (ECharts)
Stacked-bar chart of effective resource hours per day. Spot over-allocations at a glance and re-balance by dragging tasks.
Working calendars
Pre-loaded calendars for Spain, Colombia and Venezuela. Define your own with workdays + holidays — the auto-scheduler honours them.
Task editor popup
Inline editor with start, duration, % progress, predecessors, lag/lead and resources — no full reload between edits.
Core features
Critical Path Method
- शुद्ध जेएस में फॉरवर्ड + बैकवर्ड पास
- महत्वपूर्ण पट्टियाँ लाल रंग में हाइलाइट की गईं
- प्रति कार्य कुल फ़्लोट/मुक्त फ़्लोट
- प्रत्येक ड्रैग पर पुनर्गणना की गई
Multi-Baseline overlay
- किसी भी समय शेड्यूल का स्नैपशॉट लें
- भूत-बार ओवरले बनाम वर्तमान
- Compare planned vs actual
- अलग-अलग बेसलाइन को चालू/बंद टॉगल करें
Dependencies & auto-schedule
- चार प्रकार: एफएस · एसएस · एफएफ · एसएफ
- कार्य दिवसों में पिछड़ना/लीड होना
- उत्तराधिकारियों ने ड्रैग पर पुनर्निर्धारण किया
- कार्य-कैलेंडर से अवगत
Working calendars
- स्पेन, कोलंबिया, वेनेजुएला में निर्मित
- कस्टम कार्यदिवस + छुट्टियाँ
- चार्ट पर गैर-कार्यशील हाइलाइट
- प्रति-प्रोजेक्ट सक्रिय कैलेंडर
MSPDI XML round-trip
- एमएस प्रोजेक्ट 2019+ प्रारूप में निर्यात करें
- .xml से वापस आयात करें
- कार्य, निर्भरताएँ, कैलेंडर
- यात्राओं के बीच कोई प्रारूप हानि नहीं
Resource histogram
- प्रति दिन स्टैक्ड-बार (ईचार्ट्स)
- प्रभावी संसाधन घंटे
- अति-आवंटन का पता लगाना
- कार्य के लिए क्लिक करें
Settings dropdown
- 10 ब्रायंटम-शैली टॉगल
- महत्वपूर्ण पथ, आधार रेखाएं, रोलअप...
- प्रगति रेखा और सूची-केवल मोड
- प्रति-उपयोगकर्ता प्राथमिकताएँ
PNG snapshot
- एक-क्लिक कैप्चर (html2canvas)
- पीएनजी के रूप में पूर्ण गैंट
- स्थिति रिपोर्ट/ईमेल के लिए तैयार
- ज़ूम दिन/सप्ताह/माह/तिमाही
Built to be extended
- Inherit
mierp.gantt.task - Inherit
mierp.gantt.project - mierp_construction_gantt के माध्यम से BIM/IFC ब्रिज
- mierp_bim_fm के माध्यम से मोबाइल फोरमैन PWA
Why we are better than the paid alternatives
Presto and most construction ERPs depend on external Microsoft Project for the schedule, or embed the commercial Bryntum component. We bring the engine inside Odoo with zero runtime fees — vendored, audited and owned by you.
| Aspect | Bryntum (paid) | MS Project (paid) | MI ERP Gantt Pro |
|---|---|---|---|
| Licensing model | USD 940 / dev / year | USD 10 / user / month | FREE · LGPL-3 |
| Critical Path | ✓ | ✓ | ✓ (custom JS, no black box) |
| Multi-baselines | ✓ | ✓ | ✓ |
| Auto-scheduling (FS/SS/FF/SF) | ✓ | ✓ | ✓ |
| MS Project XML round-trip | ✓ | native | ✓ (MSPDI 2019+) |
| Native Odoo 19 integration | — | — | ✓ |
| Resource histogram | ✓ | ✓ | ✓ (ECharts) |
| BIM / IFC bridge (xeokit) | — | — | ✓ via mierp_construction_gantt |
| मोबाइल फोरमैन PWA | — | — | ✓ via mierp_bim_fm |
| Code ownership | obfuscated | closed | full source vendored |
Companion modules (extend & conquer)
mierp_gantt stays domain-agnostic — every vertical adds its own
bridge by inheriting mierp.gantt.task and
mierp.gantt.project. None of these are required to use the Gantt
on its own.
Construction
mierp_construction_gantt
- कार्य परियोजना
- एपीयू अवधारणा कार्य
- स्टेज सारांश
- IFC तत्व कार्य (4D)
BIM / 4D / 5D
mierp_bim_4d_5d
- xeokit IFC व्यूअर इन-टास्क
- टाइम-लैप्स 4डी एनिमेशन
- Cost overlay 5D
- 3डी में क्रिटिकल-पाथ हाइलाइट
Field Manager
mierp_bim_fm
- मोबाइल फोरमैन PWA
- दैनिक प्रगति पर कब्जा
- फोटो + जीपीएस साक्ष्य
- ऑफ़लाइन-प्रथम समन्वयन
Typical workflow
Plan
- गैंट प्रोजेक्ट बनाएं, एक कार्यशील कैलेंडर चुनें (सीओ / वीई / ईएस या कस्टम)।
- कार्यों को मैन्युअल रूप से जोड़ें, क्लिपबोर्ड से पेस्ट करें, या एमएस प्रोजेक्ट एक्सएमएल से आयात करें।
- कार्यों को एफएस/एसएस/एफएफ/एसएफ निर्भरता और कार्य दिवसों में अंतराल/लीड के साथ लिंक करें।
- प्रारंभिक आधार रेखा का स्नैपशॉट लें ताकि आप बाद में नियोजित बनाम वास्तविक की तुलना कर सकें।
Execute
- एक बार खींचें - प्रत्येक उत्तराधिकारी कैलेंडर का सम्मान करते हुए स्वतः-पुनर्निर्धारित करता है।
- जैसे-जैसे शेड्यूल आगे बढ़ता है, महत्वपूर्ण पथ को लाल होते हुए लाइव देखें।
- कार्य संपादक या WBS साइडबार (इन-सेल संपादन) में % प्रगति कैप्चर करें।
- अति-आवंटन का पता लगाने और उसका समाधान करने के लिए संसाधन हिस्टोग्राम की समीक्षा करें।
Report
- नियोजित बनाम वास्तविक की तुलना करने के लिए बेसलाइन ओवरले को टॉगल करें।
- एमएस प्रोजेक्ट चलाने वाले हितधारकों के लिए एमएसपीडीआई एक्सएमएल में वापस निर्यात करें।
- स्थिति ईमेल और साप्ताहिक रिपोर्ट के लिए पीएनजी स्नैपशॉट कैप्चर करें।
- आवश्यकतानुसार डोमेन संदर्भ जोड़ने के लिए ब्रिज (निर्माण, बीआईएम, एफएम) सक्षम करें।
Technical details
- मुख्य मॉडल: mierp.gantt.project, mierp.gantt.task, mierp.gantt.dependent, mierp.gantt.calendar, mierp.gantt.baseline।
- OWL 2 घटक mierp_gantt/static/src/components/gantt_view के अंतर्गत भेजा गया।
- क्रिटिकल पाथ इंजन: कोर/सीपीएम.जेएस - टोपोलॉजिकल सॉर्ट के साथ फॉरवर्ड + बैकवर्ड पास।
- ऑटो-शेड्यूलर: core/auto_scheduler.js - कार्य-दिवस अंकगणित, एफएस/एसएस/एफएफ/एसएफ + लैग/लीड।
- एमएसपीडीआई निर्यात: कोर/एमएसपीडीआई_एक्सपोर्ट.जेएस; आयात विज़ार्ड समान प्रारूप को पार्स करता है।
- बीआईएम / आईएफसी ब्रिज हुक: विजेट्स/आईएफसी_ब्रिज.जेएस - mierp_construction_gantt द्वारा उठाया गया।
- ओडू एंटरप्राइज और समुदाय के साथ संगत।
- इस पर निर्भर करता है: आधार, मेल, वेब।
Vendored libraries (no CDN)
| Component | Library | लाइसेंस | Vendored size |
|---|---|---|---|
| Render engine | Frappe Gantt v0.9 | MIT | 41 KB |
| Sidebar table | Tabulator v6.3 | MIT | 442 KB |
| PNG snapshot | html2canvas v1.4 | MIT | 199 KB |
| Resource histogram | Apache ECharts v5 | Apache 2.0 | shared |
Requirements
Odoo modules
- आधार (आधार)
- चर्चा करें (मेल)
- वेब (वेब)
Optional bridges
- mierp_structure_gantt - कार्य / एपीयू / आईएफसी ब्रिज
- mierp_bim_4d_5d — 4D/5D व्यूअर
- mierp_bim_fm - फ़ील्ड-फोरमैन PWA
Browser
- क्रोम 91+ / फ़ायरफ़ॉक्स 89+ / सफ़ारी 15+ / एज 91+
- मूल ईएस मॉड्यूल समर्थन करते हैं
No external services
- सभी JS लाइब्रेरीज़ को static/lib/ के अंतर्गत बेचा गया
- कोई सीडीएन नहीं, कोई टेलीमेट्री नहीं, कोई फोन-होम नहीं
- एयर-गैप्ड इंस्टालेशन समर्थित
Contact us
You'll get free assistance for 60 days for any issue or error.
For inquiries or support: [email protected]
Pricing
- प्रति-डेवलपर शुल्क नहीं
- कोई रनटाइम रॉयल्टी नहीं
- बहु-कंपनी, बहु-मुद्रा
- पूर्ण स्रोत कोड (फोर्केबल)
- सामुदायिक ईमेल समर्थन
Need the full suite?
MI ERP BIM Suite bundles the 5 core modules (Construction, BIM, Revit, 4D/5D, FM) plus the 2 Colombia localizations — Gantt included.
Available as a separate module: mierp_bim_suite.
Contact us at [email protected].